Quotes, fees and timing
Every number in the estimate, what it means, and how often it changes.
The numbers
| Row | Meaning |
|---|---|
| Amount out | What you are expected to receive on the destination, after all fees. |
| Rate | Amount out divided by amount in. For a same-asset bridge it sits just under 1. |
| Time | Typical fill time once the origin transaction confirms. |
| Network gas | Gas on the origin network for the deposit, in USD. Shown on Robinhood Chain routes. |
| Router fee, or Route cost | What the routing engine and solver charge, in USD, already deducted from amount out. Routes between other networks show this as one Route cost line. |
| Route fee | Our fee for the route: 0.25%. Already deducted from amount out and included in total fees. |
| Min. received | The floor. If the market moves against you past this, the route does not fill and funds stay put. |
Refresh and validity
Estimates refresh every 30 seconds while the app is open and again when you change any field. Opening the confirm dialog fetches a fresh quote, the dialog shows its age, and the confirm button locks if the numbers are older than 45 seconds.